The following desk study is an assessment of readily available site information including topographic geological and hydrogeological data.
What is a desk study in construction.
A site walkover is also undertaken to identify any specific sources of contamination and to collect relevant photographs.
On building design and construction projects the term desktop study is often used in relation to preliminary site investigations referring to the process of gathering background information about site specific characteristics that will need to be considered during planning design and construction or issues that may merit more detailed physical investigations such as site surveys.
What is a phase 1 desk study.
A desk study involves the collection and review of many different sources of information including.
A feasibility study will give grounds to a project and evaluate it in terms of the strengths weaknesses resources finances and how realistic a project is.
Construction industries lca adaptability.
The term desk study refers to a study that is carried out purely through research rather than physical investigations that is it can be done sitting at a desk.
The desk study should be carried out at the start of site investigation.
Local authority registers environmental databases geological maps and historic records.
A phase 1 desk study is a preliminary risk assessment from the collation and review of published information regarding a sites historical geological and environmental setting.
Its purpose is to provide as much information on the probable ground conditions and the likely problems that they will produce for the proposed type of construction as is available without commissioning new ground investigation work see chapter 1.
University of moratuwa.
Department of building economics.
The purpose of a desk study is to determine a preliminary risk rating and to plan the subsequent stages of the site investigation.
The objectives of the desk study are to.
Desk research is basically involved in collecting data from existing resources hence it is often considered a low cost technique as compared to field research as the main cost is involved in executive s time telephone charges and directories.
Many construction companies will conduct a feasibility study to assess the viability of a construction project.